The average crossing time of the San Pedro-Bamako road corridor has decreased from 72 to 48 hours since 2021, announced Mohamed Kouyaté, Secretary General of the Transport Fluidity Observatory, on Tuesday, November 24, in Abidjan, during the review of four years of activities of the PR8 project.
According to the figures presented by the OFT, the crossing can be reduced to 44 hours when rest periods are not taken into account. The stay of goods at the autonomous port of San Pedro has also been reduced from more than two weeks to about seven days.
These advances remain accompanied by a point of tension regarding road checkpoints. The number of roadblocks has risen to an average of five per 100 kilometers after having reached 2.8, while the established standard is three.
The OFT plans to strengthen local transport facilitation committees placed under the authority of the prefects. Alongside the defense and security forces, these bodies must identify obstacles to traffic and act against illegal checkpoints, while facilitating the reporting of abusive practices.
The corridor connects Bamako to the port of San Pedro via Zantiébougou, Boundiali, and Kani. The West African Economic and Monetary Union indicates that approximately 275 kilometers of roads have been paved as part of PR8, including 140 kilometers in Mali and 135 kilometers in Côte d’Ivoire.
The African Development Bank still classifies PR8 among its ongoing projects. The program sheet places its area of intervention in Worodougou and Bagoué in Côte d’Ivoire as well as in the Sikasso region in Mali.





